Nanfeng Intelligence Solutions

NR Scan

GMP Gap Analysis for Computerized Systems and Interfaces

The scope is one agreed system or interface group at one site. We check its validation documents and responsibilities, list the gap items, rank them by risk priority number (RPN) and scope the follow-on work.

01Service specification

Scope, deliverables and acceptance criteria

Scope
One site, one agreed system or interface group (for example the interface between ERP and the warehouse management system), with the document volume agreed before start
Client inputs
A named QA contact and system owner; the documents on the agreed list (for example URS, FS, existing validation records, SOPs); time for 2–3 interviews
Deliverables
System and interface scope map, document and evidence inventory, gap analysis report, risk assessment report (with RPN and regulatory basis), improvement priorities and timeline, follow-on scope statement
Acceptance
Every finding comes with a proposed treatment and traces to a document, an interview record, a regulatory requirement, or notes the information still to be provided. Your QA decides whether to accept residual risk.
Pricing
A fixed-scope, fixed-fee quote once the document volume and complexity are confirmed
Boundaries
An NR Scan is a gap analysis. It does not mean the system is validated or approved by any authority. Review and approval stay with your QA.

02How it runs

How an NR Scan runs

NR Scan gap analysis flow: 1. Scope confirmation; 2. Review of existing documents and test records; interviews; 3. Gap list; 4. Risk assessment; 5. Improvement priorities and follow-on scope; 6. Your QA decides: Decides risk acceptance and approves next actions. Risk assessment uses Severity × Occurrence × Detectability = RPN. The risk priority number (RPN) only ranks. Your QA decides whether a risk is acceptable.

We carry out

  1. 1

    Scope confirmation

  2. 2

    Review of existing documents and test records; interviews

  3. 3

    Gap list

  4. 4

    Risk assessment

    Severity × Occurrence × Detectability = RPN

    The risk priority number (RPN) only ranks

    Your QA decides whether a risk is acceptable

  5. 5

    Improvement priorities and follow-on scope

Your QA

6

Your QA decides

Decides risk acceptance and approves next actions

03How the work is shared

Who does what during an NR Scan

Us

Scoping, document review, interviews, risk assessment and gap analysis, and the report

Your QA

Confirms the scope, reviews the findings, decides on risk acceptance and approves next actions

System owner / suppliers

Provide documents and technical explanations, and answer our questions

04How an engagement progresses

What happens next

  1. 01

    Book a 30-minute project call. Together we confirm the system and scope, and whether an NR Scan fits. You may wish to review the SAMPLE deliverable pack beforehand.

  2. 02

    Run the NR Scan (gap analysis) on a fixed scope and fixed fee. You receive a gap analysis report and improvement priorities ranked by RPN.

  3. 03

    If needed, continue with validation planning (NR Blueprint) to set the control strategy and the VMP structure.

  4. 04

    In validation execution (NR Control) we write and execute the tests while your staff witness. Validation document review and closure (NR Readiness) gives you a review record and an open-items list.

  5. 05

    After go-live, sustaining the validated state (NR Sustain) covers change impact assessments, periodic evaluation and the annual state-of-control report.

Agree the scope of one system or interface group first, then start on a fixed scope and fixed fee.