Malaysia new-plant and expansion projects
Computerized system validation for new plants in Malaysia, covering each system and the interfaces between them
We support computerized system validation for new plants and expansions in Malaysia, including the interfaces between warehouse, laboratory and release, working alongside your equipment suppliers, system integrators and EPC contractor. A fixed-scope, fixed-fee NR Scan lists findings and observations against the applicable PIC/S requirements and names the service for each. The deliverables are yours, with no obligation to continue.
01
Inspection baseline: PIC/S GMP
Malaysia's National Pharmaceutical Regulatory Agency (NPRA) inspects against the PIC/S Guide to GMP and its annexes. A new site therefore prepares evidence for Annex 11 (computerized systems), Annex 15 (qualification and validation) and data integrity against the applicable PIC/S requirements. Export-market requirements (for example FDA or EMA) are confirmed item by item during scoping.
02
Recommended priorities for new plants
From a demonstration diagnosis of a fictional plant.
01
Put computerized system validation into the validation master plan at design, so it runs alongside equipment qualification.
02
For every data link between the warehouse, environmental monitoring, laboratory and release systems, write down who tests it and who validates it.
03
Verify the transfer of results from LIMS to release, so the person releasing a batch can trace every result to its source.
03
How we work
- English delivery
- Documents, meetings and correspondence can all be in English.
- Same time zone
- Taiwan and Malaysia share UTC+8, so we work the same business hours as your team.
- On-site walk-downs
- On-site walk-downs in Malaysia are scoped separately and itemized in the quote.
04
Outside our scope
- Applying for or holding a manufacturer's licence (Malaysia's statutory term) is outside our scope; licensing is a Drug Control Authority decision.
- Your site corresponds with NPRA directly; we help prepare the validation documents.
- Every approval and sign-off stays with your QA.
Begin with a 30-minute call to assess fit
A first message needs only a short description of the systems and scope; we can sign an NDA before any files are exchanged. You are welcome to look through the SAMPLE deliverable pack first to judge the format and level of detail.
