Sample NR Scan diagnosis · Finished dosage forms (oral solid dose and sterile injectables) · Full site · Greenfield

Southeast Asia Greenfield Pharmaceutical Plant (method demonstration)

A regional pharmaceutical manufacturer builds a full greenfield site in a PIC/S market. Production lines, QC laboratory, warehouse and utilities are built in parallel, and more than ten GxP systems come from different suppliers. An EPC contractor leads the build. This demonstration shows how validation across connected systems, data integrity and interface responsibilities can be planned and carried out together with every party.

Method demonstration | fictional scenario
One batch from raw material to shipment, across six systemsSAMPLE · fictional plant
1

Material quarantine and release

WMSERP

Material lot, quarantine and sampling; released after QA approval

2

Dispensing

MES / EBR

Weights written to the EBR

3

Manufacturing

SCADA / PLCMES / EBR

Process parameters and deviations

4

Packaging and serialization

SerializationMES / EBR

Packaging record and serial numbers

5

QC testing

!
LIMSCDS

Results and CDS raw data

Result hand-off

Target practice

QC-approved results reach batch review through a validated interface and the Authorised Person decides release; if a transfer error or status mismatch occurs, the batch stays in quarantine

Current practice

The result-to-release interface is awaiting validation

Recommendation: Verify the transfer of results from LIMS to release, with the batch held in quarantine if a transfer error or status mismatch occurs

6

QA review, release by the Authorised Person, shipment

eQMSERPWMS

Batch review, release decision and shipping record

Data layer: these records must be complete, traceable and available for inspection

Electronic batch recordQC raw dataAudit trailRelease recordSerialization data

NR Scan findings

In this demonstration, an NR Scan sets out 8 management goals with recommended actions

Management goal

A new plant brings more than ten systems online. Planning computerized system validation alongside equipment qualification lets testing and documentation progress steadily, keeping the start-up schedule on firmer ground.

Applicable requirement and basis

PIC/S PE 009-18 Annex 11

Management goal

More than ten systems exchange data over dozens of links, such as lot status passing from ERP to the warehouse system. Putting each link into the traceability matrix, with its own test, also allows each interface to be explained promptly during inspection.

Applicable requirement and basis

PIC/S PE 009-18 Annex 11

Management goal

After LIMS approval, release status passes to both ERP and WMS, so the two systems show the same material status and shipping decisions rest on a clear basis. If a transfer error or status mismatch occurs, the batch remains in quarantine until the status is confirmed.

Applicable requirement and basis

PIC/S PE 009-18 Annex 11

Management goal

Laboratory systems are a common focus of data integrity inspections. With the audit trail enabled and reviewed at a defined frequency, every change to a result can be seen and explained.

Applicable requirement and basis

PIC/S PI 041-1 Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments

Management goal

Servers, virtualization, network and backup form the shared infrastructure for all applications. Assigning ownership and qualifying this infrastructure provides a documented basis for recovery whenever it is needed.

Applicable requirement and basis

PIC/S PE 009-18 Annex 15

Management goal

Managing equipment PLC/SCADA separately from the office network, and assessing every patch for its effect on the validated state under change control, helps keep systems in a validated state. The 2025 draft Annex 11 revision (consultation closed, not yet adopted) raises cybersecurity expectations; current expectations still rest on PIC/S PI 041 and Annex 11.

Applicable requirement and basis

PIC/S PI 041-1 Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments

Management goal

Agreeing a shared template and minimum content with suppliers at procurement makes it quicker for QA to consolidate reports and retrieve records during inspection.

Applicable requirement and basis

PIC/S PE 009-18 Guide to GMP for Medicinal Products

Management goal

For convenience at shift change, line HMIs and MES sometimes use shared accounts. Individual accounts let every electronic record be attributed to one person.

Applicable requirement and basis

PIC/S PE 009-18 Annex 11

Scope

  • Full site: production lines, QC laboratory, raw material and finished goods warehouses, utilities (purified water, HVAC, compressed air), server room and OT network
  • About 12–20 GxP computerized systems (ERP, MES/EBR, LIMS, eQMS, WMS, EMS, BMS, SCADA, serialization, etc.) delivered by multiple suppliers
  • Applicable: the local GMP of the PIC/S Participating Authority, PIC/S Annex 1, 11 and 15; export markets may add EU GMP; whether 21 CFR Part 11 applies depends on predicate rules and record use

Stakeholders

Board / Plant Director
On-time start-up, a successful first GMP inspection and delivery within budget
Quality Assurance
A VMP, GxP system inventory and data integrity controls that can be supported with evidence at inspection
Owner's Engineering / Project
Interface coordination, FAT/SAT completed as planned, and schedule
IT/OT
Network architecture, access, backup and cybersecurity
EPC contractor
C&Q of equipment and utilities, on the contract schedule
System suppliers
Provide documentation for their own system and help confirm interface specifications

Request this diagnosis for your own systems

NR Scan has a fixed scope and fee. We review the systems and existing documents and deliver a gap analysis report, a risk assessment with risk priority numbers (RPN), and improvement priorities with a timeline. No obligation to continue.

Book a 30-minute project call →