Services
Five services for different stages of a project
Each of the five services can be engaged individually or in sequence; the deliverables of one service form the input to the next. We suggest starting with a focused gap analysis (NR Scan). NR Intelligence is still in development and not yet offered.
01Services
Assessment & advisory
01NR Scan
Gap analysis
Which risks should be addressed first, and where should resources be directed?
- Gap analysis report stating the scope, intended use and assessment date
- Risk assessment report giving, for each item, the description, impact, existing controls, severity, occurrence, detectability and risk priority number (RPN)
- Improvement priorities and timeline, ranked by RPN
Acceptance: Every finding comes with a proposed treatment and its evidence source. Your QA decides whether to accept residual risk
- Inputs
- Existing documents within the agreed scope (URS, FS, validation records, SOPs)
- System and interface list, and a network overview
- Your responsibilities
- Name a QA contact and a system owner for interviews
- Review the findings and decide on risk acceptance
- Not included
- Testing and validation execution are not included
- The results do not constitute evidence that the system is validated
Hand-off to the next step→ Gap analysis report and RPN ranking
02NR Blueprint
Validation planning
Which control addresses each risk, how is the work sequenced, and who is responsible for each part?
- Control strategy that maps a technical or procedural control to each risk
- Qualification and validation strategy, including the site validation master plan structure
- Division of work between your site, suppliers and us, with a stage-gate timeline
Acceptance: Every risk maps to at least one control and one evidence source
- Inputs
- Risk assessment (NR Scan output or equivalent)
- System list
- Your responsibilities
- Approve the control strategy and risk treatment
- Approve the VMP and the division of work
- Not included
- System-level test documents and validation reports are not included
- Contract scope negotiation or amendment is not included
Hand-off to the next step→ Control and validation strategy
02Services
Validation documentation and test execution
URS
User requirements
PQ
Performance qualification
fit for intended use
FS
Functional specification
OQ
Operational qualification
operates as specified
DS
Design specification
IQ
Installation qualification
installed as designed
Build
Build and configuration
DQ Design qualification: checks FS/DS against the URS
01We write and execute
DQ report, IQ/OQ/PQ protocols and the traceability matrix
02Your staff witness
Your staff witness test execution
03Your QA approves
Your QA approves plans, test results and the validation report
03NR Control
Validation execution
How are the controls implemented, and what objective evidence supports each conclusion?
- Computerized system validation documents, including the URS, validation plan, DQ report and IQ/OQ/PQ protocols (written and executed by us), traceability matrix and validation report
- Qualification plan, DQ report, IQ/OQ/PQ protocols (written and executed by us) and qualification report for equipment and utilities
- Deviation investigation and disposition proposals, drafted by us for your approval
Acceptance: Traceability is complete, and every deviation has a disposition approved by your QA
- Inputs
- Approved control and validation strategy
- Supplier documents (FS, DS, FAT/SAT records)
- Your responsibilities
- Provide the test environment and staff to witness testing
- QA approves validation plans, test results and reports
- Approve deviation dispositions
- Not included
- Changes to supplier software or equipment are not included
- Approval and sign-off stay with your QA
- Note: Where an applicability assessment supports it, supplier FAT/SAT records are leveraged, so testing effort is focused on the items that need their own confirmation.
Hand-off to the next step→ Executed test records and traceability matrix
04NR Readiness
Validation document review and closure
Are the validation documents complete and the deviations closed? Is the system ready for routine use?
- Review of the validation documents, including plans, test records, traceability matrix and reports
- Deviation status (closed, in progress) and closure support
- Open-items list with owners and due dates
Acceptance: Every open item has an owner and a due date
- Inputs
- Validation documents, deviation and CAPA records
- Traceability matrix
- Your responsibilities
- Assign owners and due dates to open items
- QA decides on closure and the start of routine use
- Not included
- Final approval and product release stay with your QA
Hand-off to the next step→ Document review record and open-items list
05NR Sustain
Sustaining the validated state
After changes, patches or configuration adjustments, how is the validated state maintained?
- Periodic evaluation and an annual state-of-control report
- Change impact assessments that define the validation scope affected
- A consolidated risk assessment with dates for re-assessing residual risk
Acceptance: Every change has an impact assessment and a disposition
- Inputs
- Change records, audit trail reviews, deviation and alarm records
- Scope for the annual evaluation
- Your responsibilities
- Maintain change control and provide records
- Approve periodic evaluation conclusions and actions
- Not included
- Day-to-day system operation and maintenance are not included
- Change control approval remains with your site
Hand-off to the next step→ Annual state-of-control report
In development (not yet offered)
NR Intelligence | Risk signals (in development)
Can risk signals be spotted earlier, so the system stays in a state of control throughout its lifecycle?
In development; not yet commercially offered
↻ The annual state-of-control report from NR Sustain updates the NR Scan risk assessment and informs the review of acceptance criteria.
- Intended use
- Risk
- Control
- Test
- Deviation
- Traceability
- Approval
Computerized System Validation (CSV)
Aligned with PIC/S GMP Annex 11 and GAMP 5 Second Edition
- 01URS and risk assessment
- 02Specifications and supplier documents
- 03DQ report and IQ/OQ/PQ protocols (risk-based test scope)
- 04Traceability matrix
- 05Validation report
PIC/S · International · 2011
PE 009-18 Annex 11ISPE · International · 2022-07
GAMP 5 Second Edition (2022)US FDA · USA · 1997-08-20
21 CFR Part 11
Commissioning & Qualification (C&Q)
Aligned with PIC/S GMP Annex 15
- 01URS and DQ
- 02FAT and SAT (leveraged after applicability assessment)
- 03IQ and OQ
- 04PQ
- 05Qualification report and release for use
PIC/S · International · 2015-10-01
PE 009-18 Annex 15
We provide
- Gap analysis, with interviews, document review, risk assessment (with RPN) and proposed treatments
- Validation planning, with the control strategy, VMP structure and division of work
- Validation execution: preparing the DQ report and IQ/OQ/PQ protocols, executing the tests and drafting deviation disposition proposals
- Document review and closure, reviewing the validation documents and helping close deviations
- Sustaining the validated state, with change impact assessments, periodic evaluation and revalidation scope advice
You retain
- Naming the QA contact and system owner, reviewing the findings, and formal acceptance of residual risk by your quality unit
- Providing the test environment and witnesses, and approving deviation dispositions
- QA approval of validation plans, acceptance criteria, test results and reports, and the closure decision
- Maintaining change control and approving periodic evaluation conclusions
- Product release and responses to regulatory inspections
We do not guarantee inspection outcomes, and our deliverables are not a regulatory approval. Final quality decisions, approval, sign-off and product release follow your quality management process.
- Scope
- The agreed site or systems, GMP computerized systems, existing validation documents and data integrity controls
- Activities
- 2–3 interviews with QA and the system owner, review of existing documents and test records, gap analysis and risk assessment
- Outputs
- Gap analysis report, risk assessment report (with RPN), improvement priorities and timeline
- Fees & contract
- Fixed scope and fee; no obligation to continue; the deliverables are yours