Five services for different stages of a project

Each of the five services can be engaged individually or in sequence; the deliverables of one service form the input to the next. We suggest starting with a focused gap analysis (NR Scan). NR Intelligence is still in development and not yet offered.

01Services

Assessment & advisory

  1. 01NR Scan

    Gap analysis

    Which risks should be addressed first, and where should resources be directed?

    • Gap analysis report stating the scope, intended use and assessment date
    • Risk assessment report giving, for each item, the description, impact, existing controls, severity, occurrence, detectability and risk priority number (RPN)
    • Improvement priorities and timeline, ranked by RPN

    Acceptance: Every finding comes with a proposed treatment and its evidence source. Your QA decides whether to accept residual risk

    Inputs
    • Existing documents within the agreed scope (URS, FS, validation records, SOPs)
    • System and interface list, and a network overview
    Your responsibilities
    • Name a QA contact and a system owner for interviews
    • Review the findings and decide on risk acceptance
    Not included
    • Testing and validation execution are not included
    • The results do not constitute evidence that the system is validated

    Hand-off to the next step→ Gap analysis report and RPN ranking

  2. 02NR Blueprint

    Validation planning

    Which control addresses each risk, how is the work sequenced, and who is responsible for each part?

    • Control strategy that maps a technical or procedural control to each risk
    • Qualification and validation strategy, including the site validation master plan structure
    • Division of work between your site, suppliers and us, with a stage-gate timeline

    Acceptance: Every risk maps to at least one control and one evidence source

    Inputs
    • Risk assessment (NR Scan output or equivalent)
    • System list
    Your responsibilities
    • Approve the control strategy and risk treatment
    • Approve the VMP and the division of work
    Not included
    • System-level test documents and validation reports are not included
    • Contract scope negotiation or amendment is not included

    Hand-off to the next step→ Control and validation strategy

02Services

Validation documentation and test execution

V-model: every specification level has a matching qualification
SpecificationQualification
  1. URS

    User requirements

    PQ

    Performance qualification

    fit for intended use

  2. FS

    Functional specification

    OQ

    Operational qualification

    operates as specified

  3. DS

    Design specification

    IQ

    Installation qualification

    installed as designed

Build

Build and configuration

DQ Design qualification: checks FS/DS against the URS

  1. 01We write and execute

    DQ report, IQ/OQ/PQ protocols and the traceability matrix

  2. 02Your staff witness

    Your staff witness test execution

  3. 03Your QA approves

    Your QA approves plans, test results and the validation report

  1. 03NR Control

    Validation execution

    How are the controls implemented, and what objective evidence supports each conclusion?

    • Computerized system validation documents, including the URS, validation plan, DQ report and IQ/OQ/PQ protocols (written and executed by us), traceability matrix and validation report
    • Qualification plan, DQ report, IQ/OQ/PQ protocols (written and executed by us) and qualification report for equipment and utilities
    • Deviation investigation and disposition proposals, drafted by us for your approval

    Acceptance: Traceability is complete, and every deviation has a disposition approved by your QA

    Inputs
    • Approved control and validation strategy
    • Supplier documents (FS, DS, FAT/SAT records)
    Your responsibilities
    • Provide the test environment and staff to witness testing
    • QA approves validation plans, test results and reports
    • Approve deviation dispositions
    Not included
    • Changes to supplier software or equipment are not included
    • Approval and sign-off stay with your QA
    • Note: Where an applicability assessment supports it, supplier FAT/SAT records are leveraged, so testing effort is focused on the items that need their own confirmation.

    Hand-off to the next step→ Executed test records and traceability matrix

  2. 04NR Readiness

    Validation document review and closure

    Are the validation documents complete and the deviations closed? Is the system ready for routine use?

    • Review of the validation documents, including plans, test records, traceability matrix and reports
    • Deviation status (closed, in progress) and closure support
    • Open-items list with owners and due dates

    Acceptance: Every open item has an owner and a due date

    Inputs
    • Validation documents, deviation and CAPA records
    • Traceability matrix
    Your responsibilities
    • Assign owners and due dates to open items
    • QA decides on closure and the start of routine use
    Not included
    • Final approval and product release stay with your QA

    Hand-off to the next step→ Document review record and open-items list

  3. 05NR Sustain

    Sustaining the validated state

    After changes, patches or configuration adjustments, how is the validated state maintained?

    • Periodic evaluation and an annual state-of-control report
    • Change impact assessments that define the validation scope affected
    • A consolidated risk assessment with dates for re-assessing residual risk

    Acceptance: Every change has an impact assessment and a disposition

    Inputs
    • Change records, audit trail reviews, deviation and alarm records
    • Scope for the annual evaluation
    Your responsibilities
    • Maintain change control and provide records
    • Approve periodic evaluation conclusions and actions
    Not included
    • Day-to-day system operation and maintenance are not included
    • Change control approval remains with your site

    Hand-off to the next step→ Annual state-of-control report

In development (not yet offered)

NR Intelligence | Risk signals (in development)

Can risk signals be spotted earlier, so the system stays in a state of control throughout its lifecycle?

In development; not yet commercially offered

↻ The annual state-of-control report from NR Sustain updates the NR Scan risk assessment and informs the review of acceptance criteria.

  1. Intended use
  2. Risk
  3. Control
  4. Test
  5. Deviation
  6. Traceability
  7. Approval

Computerized System Validation (CSV)

Aligned with PIC/S GMP Annex 11 and GAMP 5 Second Edition

  1. 01URS and risk assessment
  2. 02Specifications and supplier documents
  3. 03DQ report and IQ/OQ/PQ protocols (risk-based test scope)
  4. 04Traceability matrix
  5. 05Validation report

Commissioning & Qualification (C&Q)

Aligned with PIC/S GMP Annex 15

  1. 01URS and DQ
  2. 02FAT and SAT (leveraged after applicability assessment)
  3. 03IQ and OQ
  4. 04PQ
  5. 05Qualification report and release for use