Every deliverable and demonstration on this page is built on a fictional plant, so QA, engineering and IT can examine our technical judgment and documentation. We are glad to sign a non-disclosure agreement (NDA) before an engagement, and we protect your processes, system architecture and validation data under contract.

Contact us: hello@nfengis.com

Approach

Once a risk is identified, the decision rests with your QA

Following ICH Q9(R1) and Q10, we identify the risk, assess what remains after controls, let your authorized procedure decide whether to accept it, and keep it under review. We provide the risk assessment and documents; the decision is yours.

  1. 01

    Identified risk

    A risk assessment record bounded by scope and intended use

  2. 02

    Residual risk after controls

    Risk that remains once controls are in place, assessed and documented.

  3. 03

    Decision by your authorized procedure

    Your QA decides, under your procedure, whether the residual risk is acceptable

  4. 04

    Ongoing review

    Periodic evaluation and change control keep the decision current as systems and knowledge change

Each step leaves a record for your QA to review and approve

1

Intended use

URS

2

Plan

Validation plan

3

Risk

Risk assessment

4

Control

Controls & specs

5

Test

Test scripts & results

6

Deviation

Deviation records

7

Traceability

Traceability matrix

8

Approval

Validation report

✓ Validation documents complete and ready for your QA to review and approve

This is our own documentation convention, not a regulatory field list. Each field maps to a real source in the project documents, and all seven together make a complete decision record.

  1. 01Assessment scopeSource document: Risk assessment record
  2. 02Intended useSource document: URS
  3. 03Assessment dateSource document: Risk assessment record (version and date)
  4. 04Acceptance criteriaSource document: Validation plan
  5. 05Residual riskSource document: Risk assessment record, validation report
  6. 06Approving roleSource document: Validation report (QA approval signature)
  7. 07Validity period or re-assessment triggerSource document: Change control and periodic evaluation