This page shows our method through demonstrations
Every deliverable and demonstration on this page is built on a fictional plant, so QA, engineering and IT can examine our technical judgment and documentation. We are glad to sign a non-disclosure agreement (NDA) before an engagement, and we protect your processes, system architecture and validation data under contract.
Approach
Once a risk is identified, the decision rests with your QA
Following ICH Q9(R1) and Q10, we identify the risk, assess what remains after controls, let your authorized procedure decide whether to accept it, and keep it under review. We provide the risk assessment and documents; the decision is yours.
- 01
Identified risk
A risk assessment record bounded by scope and intended use
- 02
Residual risk after controls
Risk that remains once controls are in place, assessed and documented.
- 03
Decision by your authorized procedure
Your QA decides, under your procedure, whether the residual risk is acceptable
- 04
Ongoing review
Periodic evaluation and change control keep the decision current as systems and knowledge change
Each step leaves a record for your QA to review and approve
Intended use
URS
Plan
Validation plan
Risk
Risk assessment
Control
Controls & specs
Test
Test scripts & results
Deviation
Deviation records
Traceability
Traceability matrix
Approval
Validation report
This is our own documentation convention, not a regulatory field list. Each field maps to a real source in the project documents, and all seven together make a complete decision record.
- 01Assessment scopeSource document: Risk assessment record
- 02Intended useSource document: URS
- 03Assessment dateSource document: Risk assessment record (version and date)
- 04Acceptance criteriaSource document: Validation plan
- 05Residual riskSource document: Risk assessment record, validation report
- 06Approving roleSource document: Validation report (QA approval signature)
- 07Validity period or re-assessment triggerSource document: Change control and periodic evaluation
RPN sets the order of work, so people and budget go where they are needed first. The scales below are an example; each project adjusts them to your quality risk management procedure.
RPN = severity × occurrence × detectability (each 1–5, maximum 125)
Severity (S)
- 1: No quality impact
- 2: Minor, no effect on product quality or data integrity
- 3: Affects a non-critical record or process; can be corrected afterwards
- 4: May affect product quality or data integrity; investigation needed
- 5: Directly affects patient safety, product quality or data reliability
Occurrence (O)
- 1: Very rare, possibly once in several years
- 2: Occasional, about once a year
- 3: Sometimes, about once a quarter
- 4: Frequent, about once a month
- 5: Very frequent, possibly every week or every batch
Detectability (D, higher = harder to detect)
- 1: Blocked automatically or alarmed immediately
- 2: Always found in routine operation
- 3: Found in periodic review
- 4: Found only in specific audits or after the fact
- 5: Existing controls cannot detect it
RPN is a semi-quantitative ranking tool: it orders the work and is not used to accept risk. Whether residual risk is acceptable is decided by your QA under your procedure (ICH Q9(R1)).
- Create
- Record
- Process
- Review
- Retain
- Retrieve
| A | Attributable | Individual accounts, no shared credentials |
| L | Legible | Readable for the full retention period, archives included |
| C | Contemporaneous | Recorded at the time, time-stamped, never back-filled |
| O | Original | The original record or a true copy |
| A | Accurate | Calibrated inputs; changes are detectable |
| + | Complete | Raw data, metadata and audit trails included |
| + | Consistent | No loss or divergence across interfaces |
| + | Enduring | Preserved for the required retention period |
| + | Available | Retrievable on demand during inspection |
Chinese terms for ALCOA+ follow the TFDA Guidance for GMP Data Management and Integrity. ALCOA+ appears in the PIC/S PI 041, WHO and MHRA data integrity guidance, and was first set out in the EMA 2010 reflection paper on electronic source data; the FDA 2018 Q&A guidance uses ALCOA; the draft revision of EU GMP Chapter 4 (consultation closed, not yet adopted) proposes ALCOA++.
PIC/S · International · 2021-07-01
PI 041-1 Good Practices for Data Management and Integrity in Regulated GMP/GDP EnvironmentsUS FDA · USA · 2018-12
Data Integrity and Compliance With Drug CGMP: Q&A (2018)
2023-01
ICH Q9(R1) Quality Risk Management finalized
ICH Q9(R1) clarifies formality, subjectivity and risk-based decision-making.
View source ↗2025-07
Three EU GMP drafts
Revised Annex 11, a new Annex 22 on artificial intelligence and a revised Chapter 4. Consultation closed on 7 Oct 2025; all three remain drafts (consultation closed, not yet adopted) and have not replaced the 2011 Annex 11.
View source ↗2026-02
FDA Computer Software Assurance guidance revised
Applies to production and quality system software for devices under 21 CFR 820 (QMSR), not directly to drug GMP, though drug manufacturers often borrow its risk-based thinking.
View source ↗PIC/S
TFDA and several Southeast Asian authorities are PIC/S Participating Authorities
One validation and evidence framework built on PIC/S GMP principles can serve quality communication and inspection preparation across markets.
View source ↗
- Pharma and biotech quality management across sterile and high-risk products, solid dose, biologics and cell therapy
- GMP greenfield projects and multi-site quality system planning
- Data integrity under US FDA and PIC/S GMP expectations; GMP set-up and inspection readiness for pharmaceutical plants
- Cross-functional coordination, supplier alignment, validation hand-offs and project delivery
In a formal discussion, we can share the lead consultant's background for your review once a confidentiality agreement (NDA) is in place.