Sample NR Scan diagnosis · Finished dosage forms (oral solid dose and sterile injectables) · Full site · Greenfield
Southeast Asia Greenfield Pharmaceutical Plant (method demonstration)
A regional pharmaceutical manufacturer builds a full greenfield site in a PIC/S market. Production lines, QC laboratory, warehouse and utilities are built in parallel, and more than ten GxP systems come from different suppliers. An EPC contractor leads the build. This demonstration shows how validation across connected systems, data integrity and interface responsibilities can be planned and carried out together with every party.
Method demonstration | fictional scenarioDesign
Recommended practice
- Validation Master Plan and GxP system inventory
- System URSs include data integrity, audit trail and e-signature requirements
- Interface responsibility matrix: who designs, tests and validates each ERP–MES–WMS–LIMS–equipment interface
Worth confirming early
- Validation of computerized systems and interfaces needs its own plan at design
- Finalize IT/OT network design alongside equipment design, so security and segmentation are settled early
Expected benefit
- SAT and first-inspection documents can be prepared step by step on the construction schedule
