Nanfeng Intelligence Solutions

Sample NR Scan diagnosis · API and finished-goods storage (GMP/GDP) · Single site, in routine use

Temperature-Controlled API and Finished-Goods Warehouse (method demonstration)

A temperature-controlled warehouse holds both APIs and finished goods (GMP/GDP). When the environmental monitoring system (EMS), used here for temperature, records an excursion, the affected lots are placed on hold in WMS until QA has evaluated them. Today that step is manual; linking the two systems makes the response more immediate and the record more complete. The demonstration also covers loaded and seasonal temperature mapping, alarm response times and owners, EMS audit trail review, and restore testing of the temperature records.

Method demonstration | fictional scenario
01 / 08

One warehouse, two systems working together

The EMS records temperature and WMS records lots; both are validated. The next step is for lot status to update automatically when a temperature excursion occurs.

One lot through the temperature-controlled warehouse: temperature records and lot status must agreeSAMPLE · fictional plant
1

Receipt and quarantine

ERPWMS

Lot created, status: quarantine

2

QA release

ERPWMS

QA approves release; lot status in WMS becomes available

3

Cold-room storage 2–8°C

!
WMSEMS

Storage location, continuous temperature record and alarms

Temperature excursion

Target practice

EMS alarm → lots in the affected zone go on hold in WMS → QA evaluates the deviation and decides release or rejection

Current practice

After an excursion, staff set the hold in WMS manually

Recommendation: Place affected stock on hold automatically when a temperature alarm is raised

4

Picking and dispatch

WMS

Lot status checked before shipping (FEFO)

Data layer: these records must be complete, traceable and available for inspection

Lot statusTemperature recordsAlarm and response recordsAudit trailBackup and restore

NR Scan findings

In this demonstration, an NR Scan sets out 8 management goals with recommended actions

Management goal

When the EMS raises a temperature alarm, WMS places the affected lots on hold at the same time, and QA releases them after evaluation. This step is currently set manually; linking the systems makes the response more immediate and the record more complete.

Applicable requirement and basis

PIC/S PE 011-1 Guide to Good Distribution Practice

Management goal

The EMS records temperature by probe and zone; WMS records lots by storage location. Once the two are mapped, QA can list the affected lots promptly after an excursion and place them on hold sooner.

Applicable requirement and basis

PIC/S PE 011-1 Guide to Good Distribution Practice

Management goal

Building on the empty-warehouse mapping, mapping again under load and in summer and winter shows where hot and cold spots sit in actual use, giving temperature control and probe placement a sound basis.

Applicable requirement and basis

European Commission EU GDP 2013/C 343/01 Chapter 3

Management goal

The goal is for routine probes to sit at the worst-case points identified by loaded and seasonal mapping, so the record reflects what the product actually experiences. The probes are currently at their installation positions and can be re-assessed after mapping.

Applicable requirement and basis

European Commission EU GDP 2013/C 343/01 Chapter 3

Management goal

Alarms already reach the person on duty. An SOP that names the responder, the response time and night and holiday cover, and asks for the action taken to be recorded, gives every alarm a traceable record.

Applicable requirement and basis

PIC/S PE 011-1 Guide to Good Distribution Practice

Management goal

The EMS audit trail is switched on. With regular review, changed alarm limits, alarms acknowledged without comment and corrected records can all be identified and explained in good time.

Applicable requirement and basis

PIC/S PI 041-1 Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments

Management goal

The goal is for alarm limits and delays to be managed under change control, with an impact assessment before each change, so the settings in use stay consistent with the validated ones. These settings can currently be changed from an operator-level account.

Applicable requirement and basis

PIC/S PE 009-18 Annex 11

Management goal

The EMS database is backed up daily. One real restore confirms that complete, readable temperature records can be recovered within the required time after a server failure.

In MHRA 2018 inspection deficiency data (compiled by Pharmaceutical Online, 2020), Annex 11 clause 7.2 (data backup and restore verification) was cited 24 times

Applicable requirement and basis

PIC/S PE 009-18 Annex 11

Scope

  • Storage conditions: a cold room (2–8°C) and a controlled room temperature area, holding both APIs and finished goods
  • Qualification and validation targets: the EMS and its alarms, lot status management in WMS, cold-room equipment and HVAC, temperature mapping, servers and backup
  • Applicable: PIC/S GMP (incl. Part II for APIs, Annex 11 and 15; ICH Q7 for APIs), PIC/S GDP and EU GDP (incl. GDP for active substances), TFDA GDP; WHO TRS 961 Annex 9 for storing temperature-sensitive products; PIC/S PI 041 for data integrity

Stakeholders

Quality Assurance
Affected lots can be listed quickly after an excursion, and the deviation evaluation rests on complete temperature records
Warehouse operations
Clear alarm ownership and response times; uninterrupted shipments
Engineering / Facilities
Qualification of cold-room equipment and HVAC, temperature mapping and probe placement
IT
EMS server, user access, backup and restore
EMS and WMS suppliers
Each supplies its own system and supports confirmation of the EMS–WMS interface

Request this diagnosis for your own systems

NR Scan has a fixed scope and fee. We review the systems and existing documents and deliver a gap analysis report, a risk assessment with risk priority numbers (RPN), and improvement priorities with a timeline. No obligation to continue.

Book a 30-minute project call →

Book a 30-minute project call →